When a widebody freighter reaches the end of its economic life, the airframe stops being an aircraft and starts being an inventory. This spring our Austin team completed a full teardown of a Boeing 767-300ER that had flown just over 112,000 hours across three operators, and the project is a good illustration of how we approach disassembly work.

Planning the harvest

Before a single panel came off, our technical records team spent six weeks reconciling the aircraft's maintenance history. Every rotable we planned to recover had to be matched to its most recent shop visit, life-limited parts were checked against remaining cycles, and anything with an incomplete back-to-birth trace was flagged for scrap rather than resale.

  • 1,412 components tagged for recovery, including both engines and the APU
  • 96 line-replaceable avionics units routed to our repair partners for bench test
  • Landing gear assemblies removed intact and shipped for overhaul
  • Full non-incident statement and trace package prepared for every serviceable item

Disassembly on the ramp

The physical teardown took eleven working days. Engines were removed first, followed by the APU, flight controls, and the interior. Our crews work from the same removal task cards an airline MRO would use, which keeps part condition consistent and makes the paperwork straightforward when the components re-enter service.

"The value is not in the metal. It's in the records. A part with a clean trace is worth ten without one." — Teardown project lead, Reliance Aircraft International

What happens to the parts

Recovered components move into our Austin warehouse, where they are inspected, photographed, and listed with their trace documentation. Many of the high-demand rotables, such as the fuel pumps, hydraulic actuators, and cabin pressure controllers, were committed to customers before the teardown was finished.

If you operate a 767 fleet and want to discuss availability from this program, our team is ready to help. Request a quote or contact us directly.